SAP PM INTERVIEW QUESTIONS
https://www.wisdomjobs.com/e-university/sap-pm-interview-questions.html
Here below are the real interview questions in the SAP PM Interview Questions
General SAP PM INTERVIEW QUESTIONS:
- Top 5 Configurations for an SAP PM (Major)
- What is all About Master DATA
- What are the Order Types
- When you create an order what are the steps to be involved (Process Flow) & also for configurations
- What are all MTTR, MTBF, And its formulas
- How to generate the report of MTTR & MTBF
- In Notification, we can take print of in that MTTR & MTBF get generated
- Reportings
- How to create an order by IP24, IP01
- Difference between Maintenance items & Maintenance Plan
- What is a Counter maintenance plan\
- What is all about control key
- What is the integration of QM & you have to select inspection lot there is an option over their that field activated for inspection
- What is Preventive Maintenance, Breakdown Maintenance, Corrective maintenance What was the process for each of them
- What is the major overview part of notification configuration like tabs?
- Overview of all configurations pats
- What is all About Furry
- What are the integration of MM, work centers, cost centers
- Permits - Work clearance management
- WCM - (Related to permits)
- Downtime & Uptime
- How to calculate the machine efficiency through SAP PM
- What are call horizon and shift factor
- Maintenance planning attributes to the maintenance items. IP01 will create BOM at the same time
- Maintenance item attach maintenance plan
- What are the fields to be filed in the maintenance item and plan (eqp, floc, etc)
- What was the key date if you create the plan today then what should be that key date?
- Frequency of plan key date (when you created 3 months plan if you put 2days them what date will come
- IP24 - you got all the maintenance plans & then go to IP10 & counter to the orders
- Configuration + Master Data + Process Flow
- What are all the assets & structure of assets
- Movements types in MIGO like 261, 101, 552, 262, 551 (Stock entry), 561- stock building
- Order parameters process flow
- Maintenance types
- What elements are unable to fill in Functional location
- END interface I-DOC(Intermediatory documents), Furry
- How data has to be closed
- I DOC WE01,02, BDAT7 - transferring from one place to another
- When you create equipment - Object type (Rotating or static) there is an option
- If the user is restricted to change the plan otherwise will change the start and end dates
- MTTR & MTBF report and break down report
- What is all about the partnering functions
- What are all order types
- Calibration what it is - what is qualitative/quantitative, IC & MIC - QS12
- How inspection lot is generating - QA32
- What is the usage definition
- Parameters of MIC - in the task list
INFOSYS:
- IS MIC can assign all the task list items or what & is there any restrictions
- What is the formula for MTTR & MTBF
- What are the fields to be filled in the notification
- Where fico involved
- What is the control key- PM01(General notification)/2((Internal services)/3(External services)
- How external service costing done or SES
- Difference between functional location and equipment
- If BOM is similar to multiple types of equipment if change anything in the BOM or need to do all the equipment
- What is the construction type
- Where we assign the BOM to an equipment
- Difference between the measuring points and counters
- Measurement reading entry list
- User status & system status difference
- What are the fields to be filled for strategies
- What is multiple counter-plan
- How single cycle plan works
- I create multiple counter plans in single equipment by using different strategies of on will populate all orders will generate if not if every counter will generate one order
- process flow of calibration process
CAPGEMINI:
- What is an end to end implementation on SAP PM
- What was the process flow for the end to end implementation
- What are all tabs in notification wor order & also its fields
- What is master data & functional
- What is the main configuration part of the calibration process
- What is the initial step taken for the implementation of SAP PM
- What was the process flow of sap pm
- What was the process flow of calibration with its T codes
- What was the process flow of the refurbishment process with its T codes
- What was the configuration of the refurbishment process
- How sap pm implements from the scratch & what data need too implement
CYIENT:
- After the creation of a functional location what object which is unable to delete
- IW39 - display the orders of a particular period
- IW29 - Notification
- IW18 - Plans
- A pump is a functional location or an equipment
- How to define the equipment is static/rotary/portable in SAP PM
- Integration
- How to do a preventive maintenance plan
- What is the T Code for Maintenance plan creation
- Have you know about a maintenance plan
- How to create BOM
- What is measuring point & counter
- What are the major elements in master data on SAP PM
- What are the elements in creating functional location
- What is all about the structural indicator
- How to assign the Classification & characteristics in master data
- CT04, CL01
- How to calculate MTTR & MTBF
- What is all about call horizon and schedule indicator
- How to shift the plan in SAP PM
- How to create the notification with out order
Comments
Post a Comment